Do you build roof or walls first?

Author: Seamus Walter  |  Last update: Saturday, August 16, 2025

In traditional construction, the order of operations starts with the foundation, followed by floors, walls, ceiling, and lastly, the roof. As mentioned earlier, the typical order of construction starts with the foundation, followed by the floors, walls, and then the ceiling.

Do walls or roof come first?

In the construction procedure of a house using AAC blocks, it is generally recommended to start with wall construction before proceeding to roof construction. This approach ensures a stable foundation and structural integrity for the entire building.

In what order do you finish a house?

What are the Stages of Construction?
  1. Stage 1: Site preparation & foundation pour. ...
  2. Stage 2: Rough framing. ...
  3. Stage 3: Rough plumbing, electrical, & HVAC. ...
  4. Stage 4: Insulation. ...
  5. Stage 5: Drywall, interior primer finishes & begin finishes. ...
  6. Stage 6: Finish interior trim; install exterior driveways & walkways.

In what order do you install a roof?

Roof Replacement Explained In 10 Steps
  1. Initial Roof Inspection. ...
  2. Selecting Your Roofing MaterialSelecting your preferred roofing material is the next step. ...
  3. Removal Of The Old Shingles.
  4. Prepare The Roof Decking.
  5. Install Any New Vents.
  6. Install Roof Flashing.
  7. Install Starter Shingles.
  8. Install Roof Replacement Shingles.

In what order do you build a shed?

How to Build a Shed
  1. Fix the doors first of the shed. ...
  2. Place the floor panel on your shed base and check if the bearers are level with the bottom of the edge.
  3. Start building the structure with the help of the rear gable. ...
  4. Fix the panels with the help of screws at the middle, bottom and top corners.

Crafting a Sturdy Roof Hip - A Secure and Tidy Installation

Do you do floor or walls first in shed?

Lay your shed base and put up the walls

Some sheds come with wooden joists already attached to the floor sheet.

What are the 7 steps to building a shed?

It also features information on shed kits if you are looking for something quick and easy!
  1. Step 1: Plan Your Shed. Before you start building, create a plan for your shed. ...
  2. Step 2: Gather Your Materials. ...
  3. Step 3: Build the Foundation. ...
  4. Step 4: Construct the Walls. ...
  5. Step 5: Add the Roof. ...
  6. Step 6: Finishing Touches.

Should you install roof or siding first?

Since roof demolition can damage siding, roofers must exercise extreme caution when installing a new roof after a new siding project. The same thinking applies to gutters and downspouts. Starting with the roof makes more sense.

How to build a roof step by step?

10 Steps to Building a Roof
  1. Tear off the old roof. ...
  2. Install the drip edge. ...
  3. Roll out the underlayment. ...
  4. Cover the roof with felt paper. ...
  5. Waterproof the valleys. ...
  6. Apply starter shingles. ...
  7. Install the shingles. ...
  8. Install the flashing.

When building a house, when does the roof go on?

Your roof will be installed during the third stage of building your new home.

What comes first, ceiling or wall?

Start with the ceiling

We recommend you start your decorating project at the top and work your way down. Taking this approach will allow you to avoid dripping any paint onto freshly painted areas. Before you start painting, clean your ceiling, fill any holes or cracks and sand it.

In what order is a house built?

Every successful building project starts with a sturdy foundation. Once the property is cleared and ready for construction, the next step is threefold: laying footings, laying the foundation, and then framing the house. Here is a quick look at the critical steps within this stage: Footings and Foundations.

What is the correct order of renovation?

As you look to begin your whole home remodel, here's the general order of operations:
  • Planning and Design. ...
  • Demolition. ...
  • Rebuilding/Framing. ...
  • Mechanicals/Plumbing/HVAC/Electrical. ...
  • Walls. ...
  • Flooring. ...
  • Cabinets. ...
  • Appliances.

What order do you frame a house?

How to frame your house
  1. Step 1: Pick up everything you'll need. ...
  2. Step 2: Frame the floor. ...
  3. Step 3: Frame your walls. ...
  4. Step 4: Frame your ceiling. ...
  5. Step 5: Frame additional floors. ...
  6. Step 6: Add stairs. ...
  7. Step 7: Frame your roof. ...
  8. Step 8: Install your sheathing.

Do you install ceiling or wall drywall first?

Hang the Ceiling First

This makes it much easier to manage and attach the panels since you will not have to fumble around with the screws, measuring tape, and so on. Screws for drywall lids should be placed no closer than 16” from the wall. This allows the drywall to have a bit of flexibility to prevent ceiling cracks.

Do you sheath walls or roof trusses first?

If it's a small shed I would sheath all the walls first, if it's large you can sheath the corners first with full sheets. After it's sheathed, get the roof trusses/rafter assemblies up and secured, then the roof sheathing, then the felt. At this point you'll be in good shape to handle a few weeks of occasional rain.

What is the order of roof installation?

These roof layers work as a system to keep water out and keep your home a consistent temperature. New asphalt shingle roofs will be installed in the following order: decking, ice/water barrier, flashing, underlayment, starter strip, shingles, and finally, ridge caps.

Which is better, rafters or trusses?

Consider your budget, desired timeline, and design preferences. If you prioritize a one-of-a-kind look and have some flexibility in time and cost, rafters might be the way to go. However, if speed, budget, and a traditional design are your top concerns, trusses are a great option.

How long does it take to roof a house by yourself?

The truth is, anyone can replace their own roof, with the help of the many DIY websites. For residential houses, roof replacements typically take two days – the first day to remove the old roof, and the second day is to install the new one. A day or two more can be necessary depending on the size of the roof.

Do you drywall before or after siding?

On the outside, brick, stucco, stone, or siding goes up, and on the inside drywall is installed. The drywall phase of home construction is where the home takes on a more finished form — rooms are separated and divided, providing the homeowner a visual of each space.

When should you install roofing?

Fall is the universal go-to season for roof replacement. With spring's mild temperatures and early summer's weather consistency, fall is commonly referred to as the best time of year to replace your roof.

What's more expensive roofing or siding?

On average, homeowners will pay 3-5% of their home's value to renovate siding. To renovate the roof they will pay 2-4%. A complete replacement of both items will likely cost more than this.

What is the cheapest way to build a shed?

If you want to build a budget-friendly shed, opting for a classic wooden structure will be the most affordable option, along with styrene glazed windows, with roofing felt and panels. If you maintain it yearly and take good care of it, a cost-effective shed can be extremely long-lasting and durable.

How do I prepare my yard for a shed?

A little build site preparation can ensure a level, easy to maintain shed for years to come.
  1. Level the ground. ...
  2. Clear the area. ...
  3. Make sure there's plenty of room around the perimiter. ...
  4. Consider concrete or gravel. ...
  5. Keep height in mind.

What is the basic base for a shed?

Here are some standard options:
  1. Gravel Base: Involves leveling the ground and laying down a thick layer of compacted gravel. ...
  2. Concrete Slab: A solid and level shed foundation is created by pouring concrete into a prepared frame. ...
  3. Wooden Piers: Involve setting treated wood posts into the ground to support the shed.