The great thing about fiberglass swimming pools is they have a fast turnaround time and you could be swimming in your new pool in as little as 3-7 days! Most standard projects take between 2-4 weeks based on a variety of factors that you should account for prior to starting the project.
It only takes about 3–6 weeks to install a fiberglass pool. This includes the pool itself, the patio, and landscaping. You can actually swim in your pool by the end of day 2! (Compare this to 4–8 weeks for a vinyl liner pool and 3–6 months for a concrete pool.
Most of the time from a construction standpoint, a fiberglass pool is in the ground and filled with water in one day. That is primarily due to the nature of how fiberglass pools are installed. The completion process depending on the builder, can take anywhere from fourteen to thirty days.
On Average, How Long Does It Take to Build a Pool? Luckily, you may still have time to enjoy your pool this summer! Although many variables impact installation time, the average for a backyard pool is about six to 12 weeks.
Most pool projects take, on average, between 8 and 12 weeks, depending on the scope of the project. But many factors can affect your pool building timeline, including the time of year you plan to build among other things.
Resale Value
A pool can increase not only your social worth but also the value of your home. However, the increase is probably not as much as you think. According to HouseLogic, there's no real guarantee that you'll make your money back. In fact, adding a swimming pool may only increase your home's value by 7%.
Is it cheaper to build a pool in the winter? Yes, it's often cheaper to build a pool in the winter because most people book their pool construction for the spring and summer months. Because of this, many pool builders are likely to offer discounts throughout the off-season.
The cost to install an inground pool is $35,000 on average and can range from $28,000 to $55,000 and sometimes upwards of $65,000 for special customizations and extra features. An added hot tub, for example, will cost $6,000 to $15,000 and pool lighting will be another $700 to $1,800.
Creating the pool shell is the third and final step in the process. After the mold is complete and ready to use, we build the pool on top of it and then release the pool shell from the top of the mold. It only takes 1–2 days to build the pool shell.
Clean crushed gravel is the perfect base for a fiberglass pool because as long as the soil under the base is solid the pool will never move…
Fiberglass Pools Are Inert
This means that the material itself is not reactive to other substances. So, if you live in a rainy climate or an area with other harsh environmental factors, a fiberglass pool is a top choice. The material stands up incredibly well to humidity, salt, chemicals, and ultraviolet light.
Fibreglass shells rely on the water pressure in the pool to exert force against the soil around them in order to maintain their structure. If there is no water pressure in the pool, the soil around the pool can push against the fibreglass shell and cause it to crack.
In contrast, fiberglass tends to be smooth to the touch. The flip side of that is that it can get slippery, a particular concern for pool steps where falls can happen. However, a slippery surface isn't necessarily a flaw in the pool shell, but an indication that there's an algae problem.
In fact, your new inground fiberglass pool shell can be installed, connected, filled and swim-ready in as little as three weeks! By comparison, vinyl liner pools can take up to eight weeks, and concrete (gunite) pools can take up to six months.
Rain can wash off the walls of the excavated area. And this does not provide proper support for the pool. Also, when it's raining, the soil surrounding the pool will be denser, making the aboveground sink into the ground. So, before you install an aboveground pool, ensure you leave the excavated area to dry completely.
How long does it take to resurface a pool? Pool resurfacing usually takes about 5-7 days to complete. The pool resurfacing process can be hindered by weather, however, and may take up to 14 days in certain cases.
For a family of 8 people, a pool size of 18 by 36 feet is adequate. Even if you all decide to swim at the same time, there will be enough space for everyone. A rectangular shape is the best choice for this size of the pool. If there are six or less in your family, a pool size of 16 by 32 feet will be sufficient.
The experts are a split on how much a pool can contribute to a home's value. One HouseLogic study suggests an increase of 7 percent, at most, under ideal conditions, while HGTV reports that the average inground pool can up your property's value by 5 to 8 percent.
Most of the smallest in-ground pools across all pool types, on average, are around 12' by 24', 10' by 15', or even a 10' x 10' Spool/Cocktail pool! In-ground pools can be even smaller.
Fall months offer stable weather and a steady environment for pool building. The ground is drier, which allows for a faster and easier installation process. Additionally, vegetation is at an all-time high, meaning this is the best time to plant trees and bushes to dress up your new backyard.
If you are looking to install a fiberglass pool for the lowest time, both the fall and winter are the best times to achieve this. Most people want a pool installed in the spring or early summer months so they can use it right away and receive fast gratification.