Do you install flooring or shower first?

Author: Adolphus Kris DDS  |  Last update: Wednesday, October 15, 2025

By laying down the floor first, you protect it from potential water damage during the shower installation. It also allows for a smoother and more efficient process, as there is no need to work around the shower when fitting the flooring.

Should you install flooring before or after shower?

Floor first if you wanna get fixtures installed while working on shower. (most efficient). Walls first if you're worried about damage to floor.

Should you install bathtub or floor first?

Bath always installed first, then tiles set out to take into consideration floor/ceiling, bath/windows or any other feature necessary to overcome. Obviously, you could do the bulk of the tiling without the bath in, then tile down to bath once fitted...

Do you install shower floor or walls first?

Bottom line is... Floor needs to go in first and the wall tiles need to sit on that. It's not necessarily about a solid foundation (although that's what the ledger board is for so the tile doesn't slip down) it's for proper water shedding.

Do you install shower tray before or after flooring?

Hi, tiling should be done after first fix. If its a bathroom, tile after fitting of the shower tray or bath but before fitting the toilet and sink. Don't bother tiling under the shower tray, that would be pointless and may make fitting the tray harder.

The 3 Worst Tile Shower Floor Mistakes

Should you install shower base or floor first?

Expert Recommendations. In a bathroom renovation, it's best to install the shower before the flooring. This ensures proper support and prevents potential damage to the flooring during installation.

Should vinyl flooring go under a shower tray?

Yes, vinyl flooring should go under the shower tray, as this will provide a solid, waterproof base which will prevent any water leakage. In order to install vinyl flooring under the shower tray, you will need to make sure that the surface of the floor is level and even.

What is installed first when installing a shower?

Shower Pan Install

A waterproof base is the foundation of any shower. Also known as the ""shower pan,"" this base requires precise measurements and proper slope to ensure efficient water drainage (and to prevent leaks).

Should I do floors or walls first?

When redecorating a room, people often wonder, “Should I paint the walls before or after I replace the flooring?” A.G. Williams, as a professional painting and remodeling contractor, recommends finishing the flooring first, be it carpet, laminate, tile or hardwood.

Do you tile bathroom floor or shower curb first?

Floor Tiles:

When planning to lay shower tile, you should always consider doing the shower floor tile installation first.

In what order should I install my bathroom?

How to Remodel a Bathroom in 7 Steps
  1. Remove Bathroom Fixtures. ...
  2. Install the New Shower or Tub. ...
  3. Lay the New Flooring. ...
  4. Hang Drywall and Start Painting. ...
  5. Install Cabinets and Vanity. ...
  6. Update Lighting. ...
  7. Hook Up the Plumbing.

Do you put flooring under a shower?

If you're going with a shower-only setup, it's a good idea to have the flooring installed first, or you could install the shower and the floor simultaneously, since the shower tiles will likely be installed at the same time as the rest of your bathroom flooring.

Do you fit shower or tile first?

It's generally recommended to tile bathroom walls and floor before fitting the suite.

Should a toilet be installed before flooring?

Professional contractors generally recommend installing new flooring before placing the toilet.

Does flooring go under a bathroom vanity?

Generally, flooring contractors prefer that the cabinets go in first so that there is less possibility of the floor getting scratched. Cabinet installers like the floor to be in place so that the cutting and dust from the floor installation will not damage the vanity.

Does a bathtub go on top of the subfloor?

The short answer is that standard bathtubs such as alcove and corner bathtubs should always be installed first, followed by the wallboard, the subfloor and the vinyl.

Is flooring done first or last?

There are multiple tradespeople walking on it and heavy objects (like the cabinetry) that need to be carried over it. So, laying your flooring after most of the work has been finished limits the risk of scratching and marking.

What comes before the first floor?

The floor at ground or street level is called the "ground floor" (i.e. it needs no number; the floor below it is called "basement", and the floor above it is called "first") in many regions.

What comes first in remodeling?

Demolition

It's the first major step in transforming your home, setting the stage for the construction to follow.

What order should I do my shower?

  1. The Everyday Shower Routine. Everyone knows that the best showers start out even before you get in the shower. ...
  2. Step 1: Shampoo. Obviously not every day is a hair wash day, but on the days that are you want to be sure to start your shower off with shampoo. ...
  3. Step 2: Conditioner. ...
  4. Step 3: Body Wash. ...
  5. Step 4: Face Wash.

How long should it take to install a new shower?

The average shower installation takes two to five days, but your timeline will be determined by whether you choose a prefabricated or custom design. The latter will require anything from a few days to a few weeks to prepare. If you've ordered materials that need to be sourced or imported, factor it into your schedule.

Do you install shower doors before or after tile?

The work on the shower door is typically one of the last things to occur in a bathroom remodel, usually not beginning until the tile has been set.

Does anything go underneath vinyl flooring?

Underlayment is not required if the vinyl flooring will be laid over a cushion-backed vinyl floor or a tile floor below grade. In all other applications, however, you should use one, such as covering existing hardwood floors, vinyl flooring without cushion, and concrete floors.

What flooring under shower tray?

The most common choice of flooring finish when it comes to a wet room or walk in shower is tiles. A tiled floor finish also means that you have the widest choice of under tray / wet room tray available as nearly all wetroom trays are designed to accept at least a tiled floor finish.

Does shower pan sit on subfloor?

Prepare the Subfloor

The entire bottom of the shower pan needs to sit on a flat, level surface. Check the subfloor area from left to right and from front to back to make sure it's level.