Your first task should be choosing countertops. First of all, they're the focal point of the kitchen, so they're what guests will see when they first walk in. Second, they're often multi-colored, so starting off there can set the tone for any flooring and cabinets yet to come.
The first step in any home remodel timeline is planning. You need to have a clear vision of your home's appearance when the project is complete. This means sitting down and really thinking about what changes you want to make and your project budget.
Whether it's a full home addition or remodeling a room in your home, there are five distinct stages you can expect to go through: planning, budgeting, demolition, construction and cleanup.
Summer. Summer is the most popular time of year to renovate. Folks emerge from the holiday season ready to start planning, and therefore construction starts a few months later during June, July and August.
In most cases, the cabinets are installed before the floor covering but after the subfloor and underlayment. The floor covering or finish is usually cut to fit and butted against the cabinets, with a small gap between the two that is covered by nailing a shoe molding or baseboard to the bottom of the base cabinets.
It's generally recommended for the cabinets to be done first, protecting their integrity and making countertop installation as smooth as possible. This will ensure that: The countertop material(s) are only moved/installed once. There is less chance of cracking, breaking or chipping of countertop material(s)
' Light or dark, patterned or plain, your kitchen flooring and countertops can work in partnership, or else be beautifully different in their design. The best option will depend on the size of your room, the look of your cabinets, and the amount of light in the space.
Rule 1: The Work Triangle
The "Work Triangle" - the triangle made by the stove, the sink and the refrigerator - should be compact enough that it allows convenient and effective circulation for the chef, but generous enough that two people working in the kitchen aren't bumping into one another.
You should always purchase your appliances before you have your countertops measured so that everything goes smoothly during the installation of your countertops.
If the height is met, vinyl and laminate flooring can either come after the cabinets, and be installed right up to the base, or run underneath both the cabinets and the appliances, due to its thin structure.
Replacement kitchen projects average 6-8 weeks for a moderate sized kitchen. Kitchen remodeling projects that involve a larger space, wall removals, structural changes, and reconfiguration of the floor plan take longer. A fair expectation is 10-12 weeks. That's the timeframe for a custom kitchen renovation.
Dishwashers: Your dishwasher typically doesn't need to be measured, but it may be helpful to install this appliance before the countertops. This is to eliminate any issues that may arise with your dishwasher detaching from the cabinetry behind it.
If it's a feeling of space, then the lighter of the two dominant colours should go on the vertical cabinet spaces, and the darker one on the horizontal countertop ones. If you want a more intense feel, flip that dynamic around.
After Your New Countertops are Installed
You'll likely be getting new sinks along with your new countertops. For best results, it's generally recommended to wait 24 hours after countertop installation before setting up the sink.
Yes and no. It really depends on your preference, the type of cabinet, and more importantly, on the type of kitchen flooring you have and how it is installed. It isn't necessary to have your kitchen cabinets sit on the subfloor, and it certainly isn't the desired option among contractors.
Having the floor installed tightly beneath the cabinets could result in buckling and subsequent damage.
By installing flooring underneath your appliances, you'll avoid any gaps or transitions that can be visually unappealing. Protection: Another benefit of installing flooring under appliances is that it provides protection for your subfloor. Over time, appliances can leak or spill, causing damage to the subfloor.
Winter is the cheapest time of year to remodel your kitchen.
Here's how you'll save money by renovating during the winter months.
It's best to replace the pipes during the early stages of renovation. Replacing the plumbing will involve cutting into walls and floors, and replacing rusted and corroded pipes can be messy.