What needs to be done before pouring concrete?

Author: Ms. Tara Hackett  |  Last update: Thursday, August 14, 2025

Here are five of the most important things you can do before you start pouring concrete at a jobsite:
  • Conduct a pre-slab meeting to iron out plans. ...
  • Inspect formwork thoroughly. ...
  • Check reinforcing steel. ...
  • Make sure you have the right materials and equipment. ...
  • Double-check the materials and jobsite to ensure readiness.

How do you prepare the ground before pouring concrete?

Get all black soil away from the site. Dig right down to clay. Make sure you are at least 6'' below the bottom of the concrete level. Add sanded 3/4'' gravel (in max 6'' lifts) and compact until desired height/level is achieved. Cover with poly, place rebar and chairs. Place concrete.

What do you put down before pouring concrete?

A base of gravel will help prevent erosion and keep the slab from settling. Pour concrete sand to fill the gaps in the gravel base. Use a tamper or plate compactor to flatten the gravel base. If needed, add more gravel and compact until you have a 4-inch base.

What is the 1/2/3 rule for concrete?

A common and versatile mix is the 1:2:3 ratio, which consists of one part cement, two parts sand, and three parts aggregate. This mix provides a good balance of strength and workability for general construction purposes.

What is a pre-pour checklist?

The Pre Pour Foundation Inspection Checklist is a comprehensive tool used to assess and evaluate the quality and readiness of a foundation before the concrete is poured. It ensures that all necessary preparations and measures are taken to achieve a solid and structurally sound foundation.

Concrete basics for Beginners from top to bottom, ground prep, rebar, sealing & protecting

Is a pre-pour inspection necessary?

A pre-pour concrete slab inspection is a crucial step carried out before pouring concrete into the slab form. This inspection ensures that the area is well-prepared and the appropriate materials are in place before any concrete is poured.

What is checklist preparation?

Checklists are productivity must-try because they give you the “big picture” of what needs to get done. By listing out and organizing your tasks—and then checking each one off one by one—you can easily prioritize how to spend your time (and make sure no important tasks fall through the cracks).

What is the 10 20 30 40 rule concrete?

The 10-20-30-40 Rule. Let's start by discussing the essential ingredients of concrete. A typical concrete batch, by volume, contains roughly 10% cement, 20% water and air, 30% sand, and 40% gravel. The exact proportions vary up or down a little, but 10-20-30-40 is a good rule of thumb.

What is the best concrete mix for a slab?

A concrete mix of 1 part cement : 2 parts sand : 4 parts coarse aggregate should be used for a concrete slab. Concrete must be placed within half an hour of mixing. Place your concrete into your formwork; work the concrete into awkward places and corners using a shovel or trowel.

How many 94 lb bags of Portland cement to make a yard of concrete?

For a cubic yard (27 cubic feet), therefore you need 6 batches of these proportions, or 6 bags of 94 lb each of QUIKRETE® Portland Cement, 24 bags of 50 lb each of QUIKRETE® All-Purpose Sand and 36 bags of 50 lb each of QUIKRETE® All-Purpose Gravel.

Can I pour concrete directly on dirt?

It is not advisable to pour concrete directly on dirt. Even compacted soil—known as a subgrade—is not strong enough to maintain the form of concrete. You can, however, pour concrete over concrete as long as the overlay has proper bonding agents and the slab below is clear of damage.

Should I put plastic under concrete?

If you are wondering if you can get away with not having an underslab vapor barrier plastic underneath the concrete of your building project? The short answer is no; for many reasons, ASTM compliance standards require vapor barrier plastic underneath concrete slabs.

When not to pour concrete?

The Issue with Pouring Concrete in Cold Weather

When temperatures dip below 40 °F, the chemical reactions that strengthen concrete slow down and can lead to weaker concrete. If concrete curing temperatures are below freezing, the water inside the concrete can freeze and expand, resulting in cracks in your surface.

What should you put down before concrete?

Choosing the right material for your sub-base is crucial in the overall performance of your concrete base. The most commonly used materials for a sub-base include gravel, crushed stone, and sand. Gravel: It's a popular choice due to its excellent drainage properties and ability to distribute the load evenly.

Can you lay a concrete slab straight onto soil?

Can I pour concrete straight onto soil? It's essential to have a base under your concrete slab, and it's recommended to use a sub base underneath from compacted gravel, rather than sand or soil alone, as this can lead to movement and moisture damage.

How do you prepare a surface for concrete?

Concrete substrates must be mechanically prepared to remove cement laitance, existing coatings, curing compounds, and achieve a profile that is clean, dry, and free from dirt, grease, oil, and any other surface contamination. Shotblasting, grinding or similar techniques are ideally suited for this work.

How deep should concrete be for a slab?

As a rule of thumb, concrete slabs supporting lighter weights such as paths, patios and shed bases will need to be 75-100mm thick, while driveways and garages need to be at least 100mm thick. Slabs intended for commercial use should be at least 175mm thick and reinforced.

What mix makes the strongest concrete?

C40 as the strongest standard mix for heavy-duty applications. When you're looking for the strongest standard concrete mix for heavy-duty applications, C40 is your go-to choice. For this mix, you'd typically use a proportion of 1 part cement, 1.5 parts sand, and 3 parts gravel, with a water-cement ratio of about 0.35.

How many 80 lb bags of concrete are in a yard?

To produce one yard of concrete, you'll need to use about 45 80-pound bags (or 90 40-pound bags). Because of the time and labor required to prepare such a large quantity, it is usually more cost- and time-effective to have ready mix concrete delivered.

What is a concrete rule?

The 20 30 40 rule in concrete refers to the ideal mix proportions for concrete. The first number, 20, represents the percentage of cement in the mix. The second number, 30, represents the percentage of sand, and the third number, 40, represents the percentage of coarse aggregate (such as gravel).

How many gallons of water per yard of concrete?

If an average yard of concrete contains 32 gallons of water, and 28% of that evaporates, 9 gallons of water per yard is going to come out of a typical foundation. From the footings, walls, and slab in a big basement, something like 400 to 700 gallons of water vapor will enter the house.

What is the minimum time between concrete pours?

So, if everything goes to plan, there should be about 90 minutes between batch of the first lift and placement of the second lift. The concrete is a conventional 6 sack mix. ASTM C94 has a placement time limit of 90 minutes that can be extended to 2 hours, if a mix meets slump requirements upon delivery.

What is a basic checklist?

A checklist is a type of job aid used in repetitive tasks to reduce failure by compensating for potential limits of human memory and attention.

What is simple checklist method?

Checklist Method. It basically refers to a list of criteria requiring simple answers in order to assess and compare research programmes and projects.

What is a complete checklist?

In their simplest form, they are lists that outline tasks you need to accomplish. Each item on the list can be checked off as it is completed. The primary purpose of these checklists is to provide clarity and organization, helping you visualize your progress as you work through your tasks.