tile your walls first, then install the bath,sink and toilet, check for any leaks, when you are sure there is no leaks THEN tile the floor, and the adhesive you are planning to use, take it back to where you bought it and buy some proper adhesive and grout mate.
Tub and shower area first, AFTER the plumbing connections have been installed. That is, only the plumbing fixtures (shower head, tub spigot, valve handles) remain to be installed to make a functional bathing area. The rest of the bathroom (sink console, toilet, bidet, etc.) may or may not be ready.
Protection of Suite: Fitting the suite first helps protect it from potential damage that could occur during tiling.
Home renovations can be expensive, but you can still give your bathroom a makeover on a relatively low budget. With a sum as small as $5,000, you can overhaul the space, but you'll need to make smart choices and be prepared to roll up your sleeves.
Professional contractors generally recommend installing new flooring before placing the toilet.
Installing the Toilet and Vanity
With the flooring in place, the toilet is the next fixture to install. This step is followed closely by setting up the vanity, complete with plumbing for the sink and faucet. Proper installation is crucial to avoid plumbing issues later.
Recommended Order of Tasks
Here are the recommended steps for the order of bathroom remodelling tasks: Install standard bathtubs before flooring, followed by wallboard. Ensure proper support for shower installation to prevent potential damage to flooring. Consider floor preparation crucial for a bathroom renovation.
The average cost of a bathroom remodel in California ranges from $10,000 to $30,000 for a mid-range remodel, with high-end remodels going up to $70,000 or more. Costs can vary depending on the size of the bathroom, the quality of materials used, and your location within California.
The national average cost to remodel a 5x10 bathroom is $6,000, and prices usually range from $3,750 up to $13,750.
From the floor to the show cubicle, the entire process shouldn't be rushed. On average, a new bathroom installation will take up to a week though this time is variable.
The tile installation principle is that the tiled wall 'hangs' over the tiled floor. The best way to achieve this outcome is by first tiling the floor so that the wall tile will then seem to be 'sitting' on the bathroom floor.
Before you begin installing the laminate flooring, you must remove any fixtures in your bathroom, such as the toilet or pedestal sink. If you have a cabinet built into the bathroom, you will leave it and install flooring around it.
This isn't a question like whether the chicken or the egg comes first, because there's a very clear-cut answer. The installation team should mount the countertop first. Then, after setting up the new counters, they can add other fixtures such as a stovetop or a sink.
Install the vanity first, including the sink and faucet. Once you have the drain hooked up to the faucet, you can move on to the other essentials such as the mirror, cabinets and trim around the shower or tub.
Generally, flooring contractors prefer that the cabinets go in first so that there is less possibility of the floor getting scratched. Cabinet installers like the floor to be in place so that the cutting and dust from the floor installation will not damage the vanity.
What this means in practical terms is that you should always remove the toilet if you are renovating it, in order to place tiles beneath the toilet on the new bathroom floor. The toilet flange then goes atop after you install tiles for the bathroom flooring.
Beyond your bathroom's size, the areas you choose to renovate and your selected materials can go a long way in determining the final price tag. The most expensive material costs are the wet area, bathroom vanity, countertops, and tiling.
The average cost to rough-in plumbing for a bathroom is $7,000 for a new bath or major renovations. The cost of installing new pipes runs between $0.50 and $8 per linear foot for materials only. You'll also pay $45 to $200 per hour to hire a plumber. Plumbing updates during a bathroom remodel average $800.
You can complete your bathroom renovation for under $10,000, and on time, especially if it's a small bathroom renovation. Set a firm budget, plan it well from the start and get several quotes. Speak to the experts first: plumbers, tilers and electricians.