In what order do you finish a house?

Author: Randi Hermann  |  Last update: Saturday, September 6, 2025

  1. Preparing the Homesite. ...
  2. Laying the Foundation. ...
  3. Framing the Home. ...
  4. Installing HVAC, Plumbing, and Electrical. ...
  5. Adding the Insulation. ...
  6. Affixing the Drywall. ...
  7. Inserting the Interior and Exterior Finishes. ...
  8. Completing the Final Inspection and Walkthrough.

In what order should I renovate my whole house?

As you look to begin your whole home remodel, here's the general order of operations:
  1. Planning and Design. ...
  2. Demolition. ...
  3. Rebuilding/Framing. ...
  4. Mechanicals/Plumbing/HVAC/Electrical. ...
  5. Walls. ...
  6. Flooring. ...
  7. Cabinets. ...
  8. Appliances.

In what order do you frame a house?

How to frame your house
  1. Step 1: Pick up everything you'll need. ...
  2. Step 2: Frame the floor. ...
  3. Step 3: Frame your walls. ...
  4. Step 4: Frame your ceiling. ...
  5. Step 5: Frame additional floors. ...
  6. Step 6: Add stairs. ...
  7. Step 7: Frame your roof. ...
  8. Step 8: Install your sheathing.

What is the correct order of construction?

Phases of construction
  • Phase 1. Closure of the building site. ...
  • Phase 2. Land and foundation. ...
  • Phase 3. The structure of the construction. ...
  • Phase 4. Mechanical, Electrical, and Plumbing (MEP) ...
  • Phase 5. Insulation and waterproofing. ...
  • Phase 6. Finishes and closures.

What is the sequence of construction of a house?

Construction order typically starts with marking, excavation, foundation, framing, brick masonry, roofing, flooring, and finishing.

How To Buy A House (STEP BY STEP)

What are the 7 steps of construction?

The 7 Essential Stages of a Successful Construction Project
  • The complexity of construction projects necessitates multiple stages to ensure that projects are carried through to completion as planned. ...
  • Project conception. ...
  • Planning and design. ...
  • Preconstruction. ...
  • Procurement. ...
  • Construction. ...
  • Closeout. ...
  • Post-construction.

In what order is a house built?

Every successful building project starts with a sturdy foundation. Once the property is cleared and ready for construction, the next step is threefold: laying footings, laying the foundation, and then framing the house. Here is a quick look at the critical steps within this stage: Footings and Foundations.

How long to finish a house after framing?

After inspections for these items are passed, insulation and drywall are installed, which take several weeks to several months depending on the size of the home. Paint, cabinets, doors/windows, trim, tile installations, hardwood floors, and other finishes generally take around 4 to 8 months.

What is the finishing stage of construction?

Post-construction follows, focusing on finishing touches, including trim and carpentry work, final inspections, and quality checks. During this phase, project managers ensure compliance with building codes and client specifications, making sure the space is fully functional and aesthetically ready for occupancy.

How is a house built step by step?

What Are The Steps To Building a House?
  1. Building Site Preparation. Once your builder has acquired the appropriate permits, the first step in building a house is to prepare the land. ...
  2. Pouring the Foundation. ...
  3. Framing. ...
  4. Setting Up Plumbing, Electrical & HVAC. ...
  5. Adding Insulation. ...
  6. Adding Drywall. ...
  7. Interior Finishes. ...
  8. Exterior Finishes.

What order do you finish a house?

Home Renovation Timeline
  1. Week 1 – site preparation and demolition.
  2. Week 2 -3 – rough work.
  3. Week 4 – drywalling and finishes.
  4. Week 5 – interior trim and cabinetry.
  5. Week 6 – painting.
  6. Week 7 – trim out from trades, lighting, and fixtures.
  7. Week 8 – flooring, final finishes, and cleaning.
  8. Scope of work.

Should you do ceiling or floor first?

In the ongoing debate of ceiling versus flooring, the answer is clear: prioritize ceiling work before tackling flooring installations. Not only does this approach minimize potential damage, but it also ensures a seamless and efficient design process.

What is the basic rule of framing?

Use the rule of thirds.

When framing a photo, it's important to keep the rule of thirds in mind. This rule states that the main subject should be placed off-center in the photograph, either one-third or two-thirds of the way into the frame.

What is the timeline for remodeling a house?

Finished basement (ADU): ~14-18 weeks. One-room addition with crossover work (incorporating it with the rest of the home): ~16-24 weeks. Whole-home renovation: ~6-12 months. New construction: ~12-24 months.

What do you remodel first?

Bathrooms and kitchens will be the most intense renovation projects in your home because they involve a lot of mechanical, electrical, and plumbing work that often needs to be done at the same time. So, get the more intense projects out of the way first.

How to remodel a house step-by-step?

Renovation rundown: What are the steps in a home renovation?
  1. get a personalized insurance quote today. ...
  2. Make a home renovation plan. ...
  3. Set a budget. ...
  4. Hire a home renovation contractor. ...
  5. Secure home renovation permits and order materials. ...
  6. Start demolition. ...
  7. Work behind the walls. ...
  8. Paint and install flooring.

What is a finishing schedule in construction?

What is a finish schedule and why does it matter? A Finish Schedule is a form of product specification writing that outlines the materials desired on a construction project. Specifically, a Finish Schedule outlines floor, wall, ceiling materials and excludes lighting, windows, doors, and furniture.

What is the sequence of construction?

The primary construction sequences typically include site marking, excavation, concrete work, brick masonry, roof installation, flooring, and finishing touches. This discussion shall explain the different stages of construction of buildings.

What is the finishing process?

Finishing involves altering the surface of a manufactured part to achieve the desired appearance or make it easier to bond with or provide durability. The finishing processes used on the manufactured part all depend on the part's material, whether it be plastic or metal.

Do you finish flooring before or after framing?

Framing & Drywall

Framing should ideally be done before flooring as well, but drywall is up to you. It is traditionally installed before flooring, but does not have to be.

What is the longest part of building a house?

The design stage usually takes the longest in the home-building process. During this stage, you and your home builder work with a design team to make sure your design captures the details that make your new house feel like your dream home. The reason this stage is so time-consuming is the level of detail it requires.

Who sets the closing date on new construction?

Builders can set the closing process up to 60 days from the estimated completion date. During this time, you'll want to shop around for a homeowners insurance policy, which your lender will require.

What comes next after framing a house?

Once framing has passed inspection, your builder will begin enclosing your home and install siding, shingles, the roofing system, any brick or stone details your interior or exterior design requires, and the windows and doors.

What is the loudest stage of construction?

Pile driving, demo, excavation is by far the loudest.

What is construction order?

– A construction order is a document that outlines the tasks, timelines, resources, and instructions for a construction project. – Key components include project description, timeline and schedule, resource allocation, and safety and compliance guidelines.