How long does it take to install cabinets in new construction after?

Author: Carole Carroll  |  Last update: Monday, May 4, 2026

The installation of cabinets in new construction is a critical step that can take anywhere from a few days to a week, depending on the size of the space, the complexity of the cabinet design, and the level of preparation required.

How long does it take to install cabinets in new construction?

If all is well, the average time to installation for cabinet installation contractors is between 2-3 days.

What is the wait time for kitchen cabinets?

Normally, the standard wait time to get kitchen cabinets is about 4 weeks. Right now in 2023, it can take anywhere from 10 to 12 weeks to get your kitchen cabinets.

What is the labor rate for cabinet installation?

For an idea of what you're getting into, an average kitchen cabinet installation costs between $100 and $650 per linear foot for stock or semi-custom styles. This translates to a total of between $2,000 and $13,000 for a 10×10 kitchen.

Can you install kitchen cabinets in one day?

Yes. If you can use a level and a drill, you can install cabinets. It might take you a weekend to do what a pro could do in a few hours, but you can do it. It's really not that hard. Search youtube and you'll find plenty of videos showing how it's done.

What comes first? Flooring or Cabinets?

Which cabinets are usually installed first?

Mark and label the position of all of the upper cabinets on the wall with a pencil and level to double-check your layout. Plan to install wall kitchen cabinets first. That way, the base cabinets won't be in your way while you're installing the upper cabinets.

How long do cabinets need to acclimate before installing?

Acclimation Period

We recommend that you allow your new cabinetry to acclimate itself to the environment of your home for 30 to 60 days.

How much do contractors charge to hang cabinets?

When looking at the cost by linear foot of cabinetry installed, you can expect to pay around $150 to $500 per linear foot for semi-custom cabinets, or $500 to $1,200 per linear foot for custom cabinets.

Does Home Depot install kitchen cabinets?

Let The Home Depot install your cabinets for you. Get installation from professional services who are licensed, insured and background checked. Schedule an appointment today and get started on the kitchen you've always wanted.

How long does Lowes take to install cabinets?

Clear the countertops and remove all antiques, breakables and valuables from the area. How long does it take to have new cabinets installed? It can take four to nine weeks from purchase to installation, depending on whether cabinets are stock or custom and the availability of Special Order items.

Do cabinets go in before or after drywall?

You'll also need to get those walls and bulkheads drywalled, primed, and painted. Ideally, all three of these boxes (drywall, primer, and paint) will be ticked before your new cabinets arrive. It will save you a lot of hassle to have the final colour already on your walls before your cabinets go up.

What time of year do kitchen cabinets go on sale?

Holiday sales are the perfect time to shop for home upgrades. Christmas Sales: In the weeks before Christmas, there will be a high chance of finding some kitchen cabinets prices will be discounted. The reason for the discounted prices is that most people do not remodel over the holiday season.

What comes after cabinets in new construction?

The next stage of construction will see your bathroom and kitchen cabinetry finished with countertops. This is also when tile (such as kitchen backsplash and tub and shower surrounds) will be installed.

Do cabinets go in before flooring in new construction?

It's better to install kitchen flooring before cabinets

Mapping out the optimum layout, choosing new cabinets, deciding on the hardware and lighting, picking a material for the countertops, swapping out appliances, etc.

How long does it take for kitchen cabinets to arrive?

Cabinet delivery time varies depending on the cabinetry selection. Generally, the more expensive the cabinetry, the longer the lead time. No cabinetry that is of any quality will take less than 3 weeks. Higher end semi-custom cabinetry usually takes around 6 weeks and custom cabinetry from 8 to 16 weeks.

What is the hourly rate to install kitchen cabinets?

The quantities of cabinets are estimated for an average-sized kitchen, with costs of $200.00 and $180.00 per unit, respectively. Labor cost is based on an estimated 20 hours of work at $50.00 per hour, a rate that varies by region and contractor expertise. Delivery charges are included as a flat rate cost.

Is it cheaper to buy cabinets from Lowes?

Higher prices: Compared to online retailers or specialty cabinet stores, Lowe's prices might be higher for similar cabinets. Limited design expertise: Store associates may not have the same level of kitchen design expertise as dedicated cabinet specialists.

Why is cabinet installation so expensive?

Installing cabinets, even stock cabinets, requires a lot of skill and expertise. The cabinets must be level, the doors must open smoothly, and they need to last for years. It's very easy to install cabinets incorrectly, which is why skilled kitchen cabinet contractors are worth the money you pay to have them work.

How much do contractors mark up cabinets?

Most general contractors use a markup of between 15-20%. However, contractor markups largely depend on the project and average costs in the area.

What is the average price of new cabinets?

Due to the wide-ranging differences in materials and quality, new kitchen cabinets typically cost anywhere from $2,500 to $24,000. However, most new cabinet prices average between $5,500 and $13,000. This wide price range can be divided into three cabinet categories: stock, semi-custom, and custom.

How much is labor for installing cupboards?

Kitchen cabinet makers charge R300-R500 per hour on average, depending on your location and the needs of your project. Expect to be charged a premium for custom cabinetry, anywhere from R700 per hour. For individual cabinets, expect to pay around: R2000 to R6000 per cabinet for a basic design.

How many hours does it take to install cabinets?

On average, kitchen cabinet installation will be completed between 2-3 days. Depending on the size of the home and extent of customization being done, larger kitchens may require an additional 1-2 days.

Do cabinets get painted before installing?

If you are doing the painting yourself, we would generally recommend priming and painting first, then have the cabinets installed, then do any necessary touchup.

Is it okay to store new kitchen cabinets in the garage?

As a rule, once you receive cabinetry it should be placed in the first dry, secure space within normal living conditions. This automatically eliminates both options because your cabinetry would be exposed to the elements in a carport, and garage floors tend to absorb moisture from the earth resulting in damage.

Previous article
How do I protect my countertop from my air fryer?
Next article
Are you supposed to preheat a nonstick pan?